Skip to content

West Africa Francophone

Togo & Diaspora

Tilers Ghana project execution across Lomé, Kpalimé, Sokodé, Kara, and the broader French-speaking West African catchment — supported by Togo representation with technical leadership coordinated from Accra.

About this Office

Tilers Ghana’s Tema Industrial Corridor office serves one of the most specification-demanding project environments in West Africa. Established to meet the concentrated infrastructure activity of Tema’s port precincts, free zones, and heavy-industry campuses, this location operates at the intersection of precision installation and high-throughput project delivery. Fifty years of institutional tile practice — built since 1976 — inform every site assessment, material specification, and laying programme that leaves this office.

The Tema team works directly with project managers, quantity surveyors, and facilities directors operating across the industrial and coastal development belt. Proximity to port logistics reduces lead times on specification-grade tile consignments, while the office’s embedded knowledge of Tema’s soil conditions, humidity profiles, and industrial floor-loading standards ensures that every installation is engineered to perform across its full service life.

Sectors Served from Tema Industrial Corridor

Notable Project Patterns

Project programmes completed from this office consistently involve large-format industrial flooring across facilities where tile performance is a functional requirement, not an aesthetic preference alone. Pharmaceutical manufacturing clients have specified slip-resistance ratings, chemical-tolerant grout systems, and seamless cove-base detailing across production and sterile corridors. Coastal hospitality projects have required porcelain systems engineered for sustained humidity and salt-air exposure, installed to the tight tolerances that a premier guest-experience environment demands. In every case, the Tema office delivers the same specification-grade rigour that earned Tilers Ghana the Top 3 Ghana Awards Gold recognition — T3G-2028-867743 — for Tiling Specialist in 2026.

Working Hours and Contact

Tilers Ghana — Tema Industrial Corridor Office

For specification consultations, bill-of-quantity tile schedules, or large-programme site assessments, contact the Tema office directly. Initial consultations are conducted by appointment to ensure the appropriate specialist is available for the scope being discussed.